Project Update

Whew! It has been an eventful two weeks as we completed (almost) our upper level refresh in time to reopen on the 25th of January. We still have minor painting touchups to complete upstairs, while they have moved downstairs to the Pro Shop to keep us on target for timeline there. All the year-old flooring on the upper level will be replaced, as a result of our Christmas Day irrigation line flood. That will wait, as we are focused on finishing up downstairs, and there is no need to have both areas closed at one time.   Sanders worked frantically before sun up to past sun down every day that weather would permit and have covered a lot of ground. We are soggy from the rain earlier in the week but hopefully today's ridiculous wind will dry us out a bit.   The lower level project is moving right along. We anticipate being able to move operations and merchandise back into the completed ProShop after next week, as painting and flooring will be completed there.
Bunkers
- All bunkers on hole #1 are shaped, ready for edging and drainage
- The bunkers on the left and right sides of hole #9 are shaped.
- All sand and drain lines have been removed from bunkers on the remaining holes on the front nine.
- The plan is to move he dozier to hole #2 tomorrow.
- The sod that was delivered on Monday finished 15, 16, and 17.
- Other than our punch list, the back nine is complete!
Practice Facilities
Irrigation is being installed on the range and main tie-ins are underway. The new chipping green bunker has sand, we are just waiting on sod.
Pool Area
Plumbing and framing are underway at the pool
Lower Level Renovations
- Pro Shop Ceiling Tile has been installed
- Pro Shop painting is underway
- Pro Shop Floor installation begins February 15th.

- Tile Installation is underway in the Locker Rooms
- Painting in the Locker Room and 19th Hole begins on Monday in preparation for ceiling grid install
- Ceiling Grid Install begins on Tuesday
- Flooring install will continue into the 19th Hole beginning February 20th
- Stay tuned for a Design Board of finish selections coming soon!

Lake Forest Country Club

14000 Landmark Drive
Louisville, Kentucky 40245

(502) 253-9352information@lakeforestgolf.com

Copright
2024

Lake Forest Country Club • Website Design by The Marketing Squad

Lake Forest Country Club